Latest News
▶Leviathan Metals receives initial assay results from its diamond drilling program at the Central Project, Kalahari Copper Belt, Botswana|▶Silver North Intersects 2.70 metres True Width (TW) of 327 g/t Silver, 0.27 g/t Gold, 4.05% Lead and 0.91% Zinc (402 g/t AgEq) in Step Out Drilling at the Haldane Silver Property, Yukon|▶Coppernico Receives Final Drill Permit and Outlines Multi-Target Drill Program at Sombrero|▶The dollar decides: What the midterm rally in gold and silver says about the next turn|▶US September copper imports fall 3.1% from August|▶Freeport approves $4.5bn expansion, modernisation of Arizona copper project|▶The midterm elections could move silver far more than gold|▶Gold prices hit $4,000 as Democrats see electoral Sweep to gain control of Congress|▶Coinbase launches GOLD-PERP and SILVER-PERP futures offering 24/7/365 metals trading and price discovery with 25x leverage|▶Arizona Gold & Silver Reports Multiple High-Grade Intercepts Including 3.35m of 15.07 gpt Gold and 19.6 gpt Silver – Expands High-Grade Philadelphia Zone|▶Leviathan Metals receives initial assay results from its diamond drilling program at the Central Project, Kalahari Copper Belt, Botswana|▶Silver North Intersects 2.70 metres True Width (TW) of 327 g/t Silver, 0.27 g/t Gold, 4.05% Lead and 0.91% Zinc (402 g/t AgEq) in Step Out Drilling at the Haldane Silver Property, Yukon|▶Coppernico Receives Final Drill Permit and Outlines Multi-Target Drill Program at Sombrero|▶The dollar decides: What the midterm rally in gold and silver says about the next turn|▶US September copper imports fall 3.1% from August|▶Freeport approves $4.5bn expansion, modernisation of Arizona copper project|▶The midterm elections could move silver far more than gold|▶Gold prices hit $4,000 as Democrats see electoral Sweep to gain control of Congress|▶Coinbase launches GOLD-PERP and SILVER-PERP futures offering 24/7/365 metals trading and price discovery with 25x leverage|▶Arizona Gold & Silver Reports Multiple High-Grade Intercepts Including 3.35m of 15.07 gpt Gold and 19.6 gpt Silver – Expands High-Grade Philadelphia Zone|
Back to News
Latest News

Cedro garners enviro approval for Brazil's newest iron-ore export terminal

Cedro garners enviro approval for Brazil's newest iron-ore export terminal
16 October 20265 Mins read

Mining and logistics investor Cedro Participações has garnered State Environmental Control Commission approval for the development of its Porto do Meio iron-ore terminal at the Port of Itaguaí, in the Greater Rio de Janeiro metropolitan area of Brazil.

Cedro says the environmental licence approval represents the project's most significant milestone to date, especially given the rigorous and decisive process Brazil has for port and infrastructure projects.

The licence covers an initial ore handling phase with volumes not exceeding 15-million tonnes a year.

Cedro has a signed lease agreement for the iron-ore terminal over a 35-year term, having won a federal auction for the area identified as ITG02 in 2024.

Cedro International chairperson Lucas Kallas comments Porto do Meio is not just a project for the next three or five years, but a strategic transformation vector for the coming decades that will significantly increase the competitiveness of the mineral industry in Brazil.

"This project reflects our vision for the coming years in Brazil's port and mining sectors. We aim to expand our iron-ore production and the terminal is essential to our growth plan through the beginning of the next decade. The terminal provides Cedro with independence in iron-ore exports," adds Cedro chairperson José Carlos Martins.

The Porto do Meio terminal, which is located between Vale and Companhia Siderúrgica Nacional's terminals in Itaguaí, will occupy an area of about 250 000 m2, including a stockyard and berthing facility for vessels requiring water depths of up to 20 m.

The terminal will be connected to the MRS Logística rail network, which links the Iron Quadrangle in Minas Gerais to the coast of Rio de Janeiro state, creating a new corridor for iron-ore transportation.

The construction works are expected to take three years and will include civil engineering, dredging, the supply and installation of port equipment, and electromechanical assembly. At the peak of construction, the project will generate about 3 000 jobs directly and indirectly. Once operational, the terminal will directly employ 256 people and generate about 1.2-billion reais in municipal tax revenue.

While the terminal is designed to accommodate Cedro's own production, the terminal will also be open to third parties.

As a result, mid-sized mining companies that currently rely on terminals operated by large groups or trading companies to export through Itaguaí will gain direct access to international markets. This means fewer intermediaries, long-term contracts, and greater predictability, as well as competitive logistics costs owing to the terminal's proximity to the Iron Quadrangle and its rail connections. 

Our Trusted Brands

Arras Minerals
Afrikor
Arizona Gold & Silver
Astra Exploration
Aurion Resources
Bluenergies
Bactech
Digipower X
Gold Hunter Resources
Golkor
Guanajuato
Harfang
He Capital
Kodiak Copper
Leviathan
Loyalist
Mining Investment Event
Noble Plains
Pan Global
Power Metallic
SilverWolf
Spacekor
US Gold
USDC
Vivio Power
West Red Lake
Arras Minerals
Afrikor
Arizona Gold & Silver
Astra Exploration
Aurion Resources
Bluenergies
Bactech
Digipower X
Gold Hunter Resources
Golkor
Guanajuato
Harfang
He Capital
Kodiak Copper
Leviathan
Loyalist
Mining Investment Event
Noble Plains
Pan Global
Power Metallic
SilverWolf
Spacekor
US Gold
USDC
Vivio Power
West Red Lake

News & Updates

Subscribe to Our Latest News & Updates