Latest News
▶Daily Newsletter|▶Arrow Minerals targets 400% landholding expansion in iron-ore-rich Pilbara|▶Copper Mark transitions to Veramark Assurance|▶BHP sues union at Spence copper mine over 'illegal' stoppages|▶Canada's Meta Critical Minerals secures military expert Melkon as strategic adviser|▶Cedro garners enviro approval for Brazil's newest iron-ore export terminal|▶World Bank's Banga sets goal of quintupling critical minerals financing in five years|▶Dryden Gold and Eagle Lake First Nation Sign Early Exploration Agreement|▶Coinbase launches GOLD-PERP and SILVER-PERP futures offering 24/7/365 metals trading and price discovery with 25x leverage|▶Arizona Gold & Silver Reports Multiple High-Grade Intercepts Including 3.35m of 15.07 gpt Gold and 19.6 gpt Silver – Expands High-Grade Philadelphia Zone|▶Daily Newsletter|▶Arrow Minerals targets 400% landholding expansion in iron-ore-rich Pilbara|▶Copper Mark transitions to Veramark Assurance|▶BHP sues union at Spence copper mine over 'illegal' stoppages|▶Canada's Meta Critical Minerals secures military expert Melkon as strategic adviser|▶Cedro garners enviro approval for Brazil's newest iron-ore export terminal|▶World Bank's Banga sets goal of quintupling critical minerals financing in five years|▶Dryden Gold and Eagle Lake First Nation Sign Early Exploration Agreement|▶Coinbase launches GOLD-PERP and SILVER-PERP futures offering 24/7/365 metals trading and price discovery with 25x leverage|▶Arizona Gold & Silver Reports Multiple High-Grade Intercepts Including 3.35m of 15.07 gpt Gold and 19.6 gpt Silver – Expands High-Grade Philadelphia Zone|
Back to News
Latest News

Highland Copper identifies multiple optimisation opportunities at Copperwood ahead of updated feasibility

Highland Copper identifies multiple optimisation opportunities at Copperwood ahead of updated feasibility
04 June 20265 Mins read

While TSX-V-listed Highland Copper Company undertakes an integrated mine plan review and optimisation works towards an updated feasibility study on the Copperwood project, in Michigan, the company is confident it will strengthen the project's economics and technical feasibility.

The company is evaluating lower cut-off grades to expand the mineable resources on site, a simplified process flowsheet for increased recoveries and bulk ore sorting technologies to potentially incorporate the Upper Copper Bearing Sequence resource.


The results of current optimisation work, including previous process plant redesign work, are expected to be incorporated into an updated feasibility study, which, in turn, will support project development planning and financing initiatives.

The lower cut-off grades are based on a long-term copper price of about $4.80/lb, with the potential to convert additional measured and indicated mineral resources into mineable reserves.


Highland explains the Upper Copper Bearing Sequence resource hosts 10.2-million tonnes grading 1.1% copper in the measured and indicated category, which, through ore sorting technologies being evaluated, can increase operational flexibility and expand the Copperwood project's economic resources base.

Meanwhile, updated geotechnical interpretations, combined with conventional room-and-pillar mining methods, may enable optimisation of mining heights and pillar dimensions while allowing dilution to be sourced from the mineralised hanging wall rather than the floor, Highland states.

The updated feasibility study is also expected to incorporate a simplified process flowsheet that is designed to reduce secondary milling requirements, lower energy and reagent costs, decrease plant footprint and, most importantly, increase copper recoveries to 87.6% - compared to 86% envisioned in the original 2023 feasibility study.

Highland plans to publish the updated feasibility study in the first quarter of 2027.

"Given the improvement in the long-term consensus copper prices since the 2023 study, the updated study will incorporate more resources and reserves, optimised mine and process initiatives and updated capital and operating cost estimates, reflecting significant advancement on the Copperwood project," Highland CEO Barry O'Shea says.

He adds that front-end engineering design is advancing toward 40% this year, which further readies Copperwood for project financing and technical due diligence activities. 

Our Trusted Brands

Arras Minerals
Afrikor
Arizona Gold & Silver
Astra Exploration
Aurion Resources
Bluenergies
Bactech
Digipower X
Gold Hunter Resources
Golkor
Guanajuato
Harfang
He Capital
Kodiak Copper
Leviathan
Loyalist
Mining Investment Event
Noble Plains
Pan Global
Power Metallic
SilverWolf
Spacekor
US Gold
USDC
Vivio Power
West Red Lake
Arras Minerals
Afrikor
Arizona Gold & Silver
Astra Exploration
Aurion Resources
Bluenergies
Bactech
Digipower X
Gold Hunter Resources
Golkor
Guanajuato
Harfang
He Capital
Kodiak Copper
Leviathan
Loyalist
Mining Investment Event
Noble Plains
Pan Global
Power Metallic
SilverWolf
Spacekor
US Gold
USDC
Vivio Power
West Red Lake

News & Updates

Subscribe to Our Latest News & Updates