Latest News
Trident options out non-core Knife Lake copper project|Peru copper output up 2.3% year-on-year in May|USA Rare Earth successfully produces technically-demanding dysprosium from magnet scrap|Australia's export finance agency boosts jobs by 21% amid critical minerals push|VanEck’s Casanova sees gold's pullback as noise, says mining stocks remain the standout trade|Cooler CPI Ignites Gold Rally as Rate Hike Bets Evaporate|Antofagasta's first-half copper output drops 9.5%, uptick seen ahead|Rio Tinto beats quarterly iron-ore sales estimates, flags rising diesel costs|Coinbase launches GOLD-PERP and SILVER-PERP futures offering 24/7/365 metals trading and price discovery with 25x leverage|Arizona Gold & Silver Reports Multiple High-Grade Intercepts Including 3.35m of 15.07 gpt Gold and 19.6 gpt Silver – Expands High-Grade Philadelphia Zone|Trident options out non-core Knife Lake copper project|Peru copper output up 2.3% year-on-year in May|USA Rare Earth successfully produces technically-demanding dysprosium from magnet scrap|Australia's export finance agency boosts jobs by 21% amid critical minerals push|VanEck’s Casanova sees gold's pullback as noise, says mining stocks remain the standout trade|Cooler CPI Ignites Gold Rally as Rate Hike Bets Evaporate|Antofagasta's first-half copper output drops 9.5%, uptick seen ahead|Rio Tinto beats quarterly iron-ore sales estimates, flags rising diesel costs|Coinbase launches GOLD-PERP and SILVER-PERP futures offering 24/7/365 metals trading and price discovery with 25x leverage|Arizona Gold & Silver Reports Multiple High-Grade Intercepts Including 3.35m of 15.07 gpt Gold and 19.6 gpt Silver – Expands High-Grade Philadelphia Zone|
Back to News
Latest News

Trekor produces solid amounts of copper, cathode in Q2

Trekor produces solid amounts of copper, cathode in Q2
15 July 20265 Mins read

Toronto- and London-listed Trekor Metals produced 30.3-million pounds of copper and 559000 lb of molybdenum in the second quarter.

The company owns the Gibraltar mine, in British Columbia, and the Florence Copper production facility, in Arizona.

Mining activities were focused on the lower benches of the Connector Pit, which delivered ore grades in line with the life-of-mine average. Trekor explains mill throughput and recoveries were also consistent with the prior two quarters.

Trekor is undertaking production ramp-up activities at Florence Copper, with a total 5.2-million pounds of copper cathode having been produced in the second quarter. At the end of June, Florence Copper had 110 production wells operating and feeding the plant. The company is on track to bring an additional 26 wells into production in August, with more monthly additions of new wells planned for the remainder of the year.

Trekor expects to produce between 110-million and 115-million pounds of copper and between 30-million and 35-million pounds of copper cathode in the full-year. 

Our Trusted Brands

Arras Minerals
Afrikor
Arizona Gold & Silver
Astra Exploration
Aurion Resources
Bluenergies
Bactech
Digipower X
Gold Hunter Resources
Golkor
Guanajuato
Harfang
He Capital
Kodiak Copper
Leviathan
Loyalist
Mining Investment Event
Noble Plains
Pan Global
Phenom Resources
Power Metallic
SilverWolf
Spacekor
US Gold
USDC
Vivio Power
West Red Lake
Arras Minerals
Afrikor
Arizona Gold & Silver
Astra Exploration
Aurion Resources
Bluenergies
Bactech
Digipower X
Gold Hunter Resources
Golkor
Guanajuato
Harfang
He Capital
Kodiak Copper
Leviathan
Loyalist
Mining Investment Event
Noble Plains
Pan Global
Phenom Resources
Power Metallic
SilverWolf
Spacekor
US Gold
USDC
Vivio Power
West Red Lake

News & Updates

Subscribe to Our Latest News & Updates